THEPITOT GAMES
Grille Rush
100 supply grilles. One flow hood. One general contractor who really needs that report.
- Move: WASD / arrows. Look: mouse (click to lock) or drag.
- Read: stand under a grille, hold E or the mouse button.
- Readings within ±10% of design pass. Too slow and the GC drops by.
- Watch out for job-site surprises: carpet crews, lifts, ladders, painters, ceiling tiles, lights out, fire alarm tests.
- C: Call the Office (3 per run) to send the GC away and buy time.